OPERATOR INFORMATION SUPPLIED BY VIATOR

Climb Kilimanjaro 8-Day Lemosho Route with Stunning Scenic Views

Overview

The Lemosho route is considered one of the easier routes on Kilimanjaro, as its longer itinerary allows for better acclimatization. However, hikers will still need to ascend the Barranco Wall and climb steeply on summit night. The 8-day Lemosho climb gives one of the highest success rates, rather than trying to squeeze the climb into 7 days. The extra day allows for a shorter pre-summit day, meaning that you arrive at base camp by lunchtime, fuel up with food, and tuck up in your tent to rest for what will be a tough summit ascent starting at midnight. Experienced and already acclimatised mountaineers may opt for the more difficult 7-day ascent along the Lemosho route. No technical climbing is required, but a good level of fitness is recommended.

Itinerary

Day 1: Moshi to – Londorossi Gate (2100m) – Big Tree Camp (2750m)

Stop 1

After breakfast, transfer to Londorossi Gate for registration. Begin trekking through the lush rainforest, arriving at Mti Mkubwa. Elevation: 2,100m to 2,780m Trekking Time: 3-4 hours

4 hr · Admission included

Day 2: Big Tree Camp (2750m) – Shira 1 Camp (3540m)

Stop 1

Continue through the rainforest, reaching the Shira Plateau and enjoying the first glimpse of Kibo Peak. Arrive at Shira 1 Camp for the night. Elevation: 2,780m to 3,500m Trekking Time: 5-6 hours

6 hr · Admission included

Day 3: Shira 1 (3540m) – Shira 2 (3840m)

Stop 1

A gentle trek across the Shira Plateau, where you’ll experience panoramic views of Mount Meru and the surrounding wilderness. Spend the night at Shira 2 Camp. Elevation: 3,500m to 3,850m Trekking Time: 4-5 hours

5 hr · Admission included

Day 4: Shira Two Camp - Lava Tower ( 4600)-Barranco Camp (3950m)

Stop 1

Trek across semi-desert terrain to the Lava Tower (4,600m) for acclimatization, then descend to the scenic Barranco Camp nestled under the Barranco Wall. Elevation: 3,850m to 3,900m via 4,600m Trekking Time: 6-7 hours

7 hr · Admission included

Day 5: Barranco Camp (3950m) – Karanga Camp (4235m)

Stop 1

Climb the Barranco Wall, a challenging but rewarding section of the route. Hike to Karanga Camp, offering great acclimatization for the summit push. Elevation: 3,900m to 4,035m Trekking Time: 4-5 hours

5 hr · Admission included

Day 6: Karanga Camp (4235m) – Barafu Hut (4600)

Stop 1

Ascend to Barafu Camp, your base camp for the summit push. Rest and prepare for the midnight ascent to Uhuru Peak. Elevation: 4,035m to 4,673m Trekking Time: 4-5 hours

5 hr

Day 7: Summit attempt Barafu Camp (4600m) – Uhuru Peak (5895m) – Mweka (3100m)

Stop 1

Start your summit attempt around midnight. Reach the highest point, Uhuru Peak (5,895m), by sunrise. After celebrating at the Roof of Africa, descend to Mweka Camp for the night. Elevation: 4,673m to 5,895m (summit), then down to 3,068m Trekking Time: 12-14 hours

14 hr

Day 8: Mweka Camp (3100m) – Mweka Gate (1980m)

Stop 1

A final descent through the rainforest to Mweka Gate. Celebrate your achievement with a certificate and transfer back to Moshi for a well-deserved rest. It is here on the mountain that you will present your tips to the guide, assistant guides, chef(s), and porters. After celebrating, you will descend for three hours back to Mweka Gate. The National Park requires all hikers to sign their names to receive certificates of completion. Hikers who reached Stella Point (5685m) receive green certificates and hikers who reached Uhuru Peak (5895m) receive gold certificates. You will be served a hot lunch then you will drive back to Moshi for long overdue showers and more celebrations.

3 hr
What’s included
What’s not included
Meeting, pickup & tickets

Meeting point

Kindly inform us of your spot (It may be a hotel, a restaurant, a bus stop etc.) and with our excellent knowledge of the region, we will reach you.

End point

Kindly inform us of your spot (It may be a hotel, a restaurant, a bus stop etc.) and with our excellent knowledge of the region, we will reach you.

Our Airport Pick-up Team always have a paper with your name on it; kindly observe right after coming out to spot her/him/them

Our Operation manager will accompany you and the crew to Mount Kilimanjaro Gate, to ensure registration and Check-ins goes well; then he/she will hand over the permits to your guide and he will keep them until you check out.

Cancellation policy

If you cancel at least 3 full day(s) before the scheduled departure time, you will receive a full refund.If you cancel within 3 day(s) of the scheduled departure, you will receive a 0% refund.

Languages
Traveler information

Confirm the selected option, current terms, travel date and final price on Viator before booking.